INDUSTRIAL ELECTRICAL JULY 2026

Discover the Future of Industry with Our Latest Edition! Explore expert insights on Industry 4.0, Green Hydrogen (GH₂), Renewable Energy, cutting-edge technologies, and exclusive interviews with India's top industry leaders.

YOUR INDUSTRY EXPERT

YOUR INDUSTRY EXPERT

Get SUNplugged

Get SUNplugged

Powering the World’s Largest Fully Integrated Solar Manufacturing

Ecosystem, Recognized Globally for Excellence

Powering the World’s Largest Fully Integrated Solar Manufacturing

Ecosystem, Recognized Globally for Excellence

Innovating India’s Solar Revolution with Advanced Technology, Superior

Quality, and Sustainable Solutions

Innovating India’s Solar Revolution with Advanced Technology, Superior

Quality, and Sustainable Solutions

640 Wp (G12R)

640 Wp (G12R)

Shine TOPCon

Shine TOPCon

JULY 2026 Vol V Issue VII

Email: info@industrialoutlook.in Visit us: www.industrialoutlook.in Pages 96 RNI No- MHENG/26/A2251 200/-

Follow us on:

(/(&75,&$/

OUR TEAM

Electricals

Electric

Vehicle

Solar

Automation

Power

Periodicity - Monthly

Langauge - English

The Industrial Electrical magazine is published by A AND A MEDIA GROUP for

exclusive circulation within the commercial and industrial sectors. All articles,

advertisements, content, images, and photographs published herein are created by the

Publisher and/or its contributors at their own discretion and do not necessarily represent

the views of the magazine.

All rights, titles, and interests (including intellectual property rights) in the materials

shall vest with either the Publisher or the respective contributors. While the Publisher

ensures the integrity of the content, contributors are solely responsible for ensuring

their submissions do not infringe upon the intellectual property rights of any third party.

Industrial Electrical shall bear no liability for any article, content, advertisement,

advertorial, image, or photograph appearing in any issue. All materials are strictly

copyrighted and all rights are reserved. No part of this publication may be reproduced

in whole or in part without the prior written permission of the Publisher.

Printed by- Susheela Prints & Graphics, A-2104,

Bhandup Indl. Estate, Pannalal Compound,

LBS Rd, Bhandup (W), Mumbai, Maharashtra 400078

Publisher- A AND A MEDIA GROUP

Place Of Publication- Building No.17, Flat No. 1304,

Haware City, Ghodbunder Road, Kasarvadavli,

Thane West, Maharashtra - 400615

Registered Office- 103, E blog, Regency Park,

HM Road Kalyan East- 421306

Editor- Roopal Chaurasia

Publication Date- 15th of every month

Group Editor: Roopal Chaurasia

editor@industrialoutlook.in

Editorial Quality Controller:

Dr. Rishi Muni Dwivedi

Editorial: Ravishu Kumar Gupta,

Jyoti Karmiyani, Sushmita Shukla, Durga

Chief Executive Officer: Pradeep K. (Amit)

info@industrialoutlook.in

Sales & Marketing:

Sunil Shirsat, Sanjeev Kumar, Dileep Shah,

Manju Kumari, Madhu

Advertising: info@industrialoutlook.in

IT : Tanishka Mavi

Designer: Amit Kumar

Digital: Urvashi Pande

Accounts & Admin: Prabhat Gupta

Subscription Desk:

subscription.industrialoutlook@gmail.com

GRAHAM INDIA PRIVATE LIMITED

E-1123/24, Ganesh Glory – 11, Near BSNL Office,

S.G. Highway - 382470, Ahmedabad, India

Amit Anturkar (Country Director)

Mob.: +91 76002 96366 E-mail: AAnturkar@graham-mfg.com

Web Site: www.graham-mfg.com

GLOBAL LEADER

IN VACUUM & HEAT

TRANSFER

TECHNOLOGY

CONTENTS

News

P.12

173&DSSURYHVൟFURUH

investment...

P.12

$YDDGDHOHFWUREHJLQVFRPPHUFLDO

operations...

3

$03,1HQHUJ\LQNVSSDIRU0:

)'5(SURMHFW

3

&(5&LQWURGXFHVRQHWLPH*1$

UHOD[DWLRQIRUUHQHZDEOH

3

2PHJDVHLNLPRELOLW\H\HVLQYHVWRU

EDFNLQJIRUQH[WSKDVH

3

6ZHOHFWHQHUJ\V\VWHPVFRPPHQFHV

RSHUDWLRQVRIPZ

P.18

7UDQVPLVVLRQFRQQHFWLYLW\RI*:

UHQHZDEOHSURMHFWV

P.18

3RZHULFDVHFXUHV0:ZLQGSRZHU

SURMHFWIURP*891/

3

5$+85,FOHDQWHFK3YW/WGERRVWV

UHQHZDEOHSRUWIROLRZLWK0:

3

6RODUFRPSDQLHVH[SDQGVWRUDJH

FDSDELOLWLHVZLWKEDWWHU\

P.22

*5(JUHHQHQHUJ\FRPPHQFHV

operations at solar...

P.22

.XGDQNXODPQXFOHDUSRZHUSODQW

XQLWVHHV

3

6-91¶V0:%LNDQHUVRODU

SRZHUSURMHFWLQDXJXUDWHG

3

.(&LQWHUQDWLRQDOVHFXUHVILUVW

GDWDFHQWUH

:HOFRPLQJRXU

P.

Leadership for the Next Phase

of Growth

INTERACTION

0583+$5

65,9$67$9$

9,&(35(6,'(17

/$33,1',$

Page 

MR. 3,<86+*$5*

DIRECTOR

%$/$-,6:,7&+*($56

397/7'

Page 

MR. MANOJIT

%5$+0(

DIRECTOR

6'7521,&6397/7'

Page 28

05-8/,$1

THOMAS

3257)2/,2 DIRECTOR

±(1(5*< %$77(5<

SECTOR

INFORMA MARKETS

,1',$397/7'

Page 

060,1$/

65,1,9$6$1

0$1$*,1*

DIRECTOR

.(6$5,,1)5$%8,/'

397/7'

Page 

053$/$1,6$0<

/$.6+0$1

&+,()%86,1(66

OFFICER

$8720$7,21

)8-,(/(&75,&,1',$

Page 

P.86

BPE

launches

BPE Active Tile...

P.82

Introducing

India’s

Most...

PRESS RELEASE

Cover Story

Automation 4.0: Transforming

Industries Through...

P.44

EPS Industry Connect 17th Edition

Jammu

P.54

Industry Focus - II

Accelerating BESS deployment in C&I

Sector: Revenue...

P.62

Guest Article

Lessons from India’s escalating

electrical fire tragedies

P.66

Guest Article

Rural Electrification In India:

achievement...

P.70

Guest Article

Client Testimonial

P.76

Guest Article

P.74

Industry Focus - I

Exploration of latest methods using

Green Hydrogen for...

P.58

Jaipur

P.40

EPS Industry Connect 16th Edition

CONTENTS

Compact Box PCs for

Smart Industria...

Dear Folks

As industries worldwide navigate rapid technological advancements and evolving sustainability goals, this edition explores

the innovations shaping the future of manufacturing, energy, and industrial development. Our lead cover story, "Transforming

Industries Through Smart Technologies," examines how digital transformation, automation, artificial intelligence, IoT, and

data-driven decision-making are enhancing operational efficiency, productivity, and competitiveness across industrial sectors.

Our second cover story, "India's Perspective on Renewable Energy," highlights the nation's remarkable progress toward building

a cleaner, more resilient energy ecosystem. From ambitious renewable energy targets and policy initiatives to technological

innovations and investment opportunities, we present insights into India's journey toward a sustainable energy future.

This edition also features a special industry focus on the latest methods of utilizing green hydrogen for petroleum feedstocks

through existing infrastructure. As industries seek practical pathways for decarbonization, this emerging approach demonstrates

how current assets can be leveraged to accelerate the transition to cleaner fuel production while optimizing investments.

In addition, we bring you the latest industry news, expert analyses, thought-provoking guest articles, and exclusive interactions with

leading industry professionals. Their perspectives provide valuable insights into emerging trends, technological breakthroughs,

policy developments, and the opportunities that will define the industrial landscape in the years ahead.

At Industrial Outlook, our commitment remains to deliver reliable, relevant, and insightful content that empowers professionals,

business leaders, policymakers, and innovators to make informed decisions in an ever-changing industrial environment.

We extend our heartfelt gratitude to all our readers, contributors, industry experts, and partners for your continued trust and

unwavering support. Your encouragement inspires us to continually raise the bar and bring you meaningful industry insights. We look

forward to your continued association and wish you an insightful reading experience.

Happy Reading!

Stay informed. Stay inspired.

Roopal Chaurasia

Disclaimer : The content and numbers of this

edition may mismatch of differ due ot current

change in the market. Industrial Electrical is

not responsible for such changes or errors.

Please write your feedback/

suggestions or question on

editor@industrialoutlook.in

Visit us: www.industrialoutlook.in

EDITOR NOTE

Avaada Electro recently announced

the operationalisation of a 3 GW solar

cell production line at its manufacturing

facility in Butibori, Nagpur, Maharash-

tra, as part of its plans to expand its

solar manufacturing capacity.

The production line forms part of the

company's 6 GW high-efficiency solar

cell manufacturing facility, which is

being developed as a key step towards

Avaada

Electro's

broader

goal

of

achieving 12 GW of solar cell capacity.

In a statement, the company said it has

advanced its 6 GW high-efficiency

N-Type TOPCon solar cell manufactur-

ing facility at its integrated solar manu-

facturing complex in Butibori.

The operationalisation of the new line

marks a significant milestone in Avaada

Electro's efforts to strengthen domestic

solar manufacturing capabilities and

scale up production of advanced solar

cell technologies.

AVAADA ELECTRO BEGINS COMMERCIAL OPERATIONS

OF 3 GW SOLAR CELL UNIT IN NAGPUR

NEWS

State-owned power producer NTPC

Ltd. has approved an investment of

₹20,456.70 crore for the development of

the 1,600 MW Lara Super Thermal

Power Project Stage-III in Chhattisgarh.

In a regulatory filing on Saturday, the

company said its Board of Directors, at

a meeting held on July 11, approved the

investment proposal for the Stage-III

expansion of the Lara project, which

will comprise two 800 MW units.

"The Board of Directors of NTPC

Limited in its meeting held today, i.e.

July 11, 2026, has, inter alia, approved

the investment proposal for Lara Super

Thermal

Power

Project,

Stage-III

(2x800 MW) at the current estimated

cost of ₹20,456.70 crore," the company

said in the filing.

The approval comes as NTPC continues

to strengthen its thermal generation

capacity while enhancing operational

flexibility to support the country's evol-

ving power mix. On June 5, the compa-

ny invited bids from technology solu-

tion providers to help its sub-critical

thermal power units operate efficiently

at lower loads, enabling greater integra-

tion of renewable energy into the

electricity grid.

NTPC APPROVES ₹20,456.7-CRORE INVESTMENT

IN LARA STAGE-III POWER PLANT

12 | July 2026 | www.industrialoutlook.in

Our Solution. Your Success.

Extensive expertise for your application.

www.nord.com

Member of the NORD DRIVESYSTEMS GROUP

NORD DRIVESYSTEMS Pvt.Ltd.

282/2, 283/2, plot no. 15, Village Mann, Taluka Mulshi,

Adj.Hinjewadi MIDC-II, Pune- 411057 Maharashtra INDIA

Toll Free No. 1800 200 2042

India@nord.com, www.nord.com

KEC International Ltd has secured

new orders worth ₹1,180 crore across

its transmission and distribution (T&D),

renewables, civil, and cables & conduc-

tors businesses, including its first trans-

mission line project to support power

evacuation for a data centre in India.

The latest order wins have taken the

company's financial year 2027 (FY27)

year-to-date order intake beyond ₹5,200

crore, strengthening its project pipeline

across domestic and international mar-

kets.

In the T&D segment, KEC International

has secured a 400 kV transmission line

project in Western India for evacuating

power to a data centre. The company

has also received orders for supplying

transmission line towers in the Middle

East, along with towers, hardware and

poles for projects in the Americas.

The company's renewables business has

won a 200+ MW solar photovoltaic

project in Western India from an

existing private sector customer. Its

civil business has secured additional

civil and structural works for a 150 MW

thermal power plant in Eastern India,

while the cables and conductors divi-

sion has received multiple domestic and

overseas orders.

The order win comes amid rising

demand for power infrastructure driven

by data centre expansion, renewable

energy capacity additions and grid

modernisation initiatives in India and

overseas markets.

KEC INTERNATIONAL SECURES FIRST DATA CENTRE T&D PROJECT

IN ₹1,180 CRORE ORDER WIN

NEWS

Hon’ble Prime Minister Shri Naren-

dra Modi inaugurated SJVN’s 1,000

MW Bikaner Solar Power Project from

Pachpadra, Rajasthan, marking a major

milestone in India’s renewable energy

journey and reaffirming the country’s

commitment to clean energy and sus-

tainability goals.

The event was attended by several

dignitaries, including the Hon’ble Gov-

ernor of Rajasthan Shri Haribhau Kisan-

rao Bagde, Chief Minister Shri Bhajan

Lal Sharma, Union Minister of Power

and Housing & Urban Affairs Shri

Manohar Lal, Union Minister of Petro-

leum and Natural Gas Shri Hardeep

Singh Puri, Union Minister of State

(Independent Charge) for Law & Justice

and Parliamentary Affairs Shri Arjun

Ram Meghwal, Rajasthan Deputy Chief

Ministers Smt. Diya Kumari and Dr.

Prem Chand Bairwa, among others.

Senior officials of SJVN and its renew-

able arm SJVN Green Energy Limited

(SGEL), including CMD Shri Bhupend-

er Gupta and other directors, also joined

the event virtually.

Developed by SJVN through SGEL in

Bikaner, the project has been executed

with an investment of around ₹5,492

crore across nearly 5,000 acres. It is

India’s largest single EPC solar project

under the Domestic Content Require-

ment (DCR) category at a single loca-

tion, highlighting the use of indigenous

manufacturing capabilities.

SJVN’S 1,000 MW BIKANER SOLAR POWER

PROJECT INAUGURATED BY PM

14 | July 2026 | www.industrialoutlook.in

SWELECT Energy Systems Limited

has successfully commissioned a 4.40

MW solar power plant on July 3, 2026,

at V. Muthulingapuram village in Virud-

hunagar taluk, Virudhunagar district,

Tamil Nadu.

The plant is connected at the 33 kV

level to the 33/11 kV Naranapuram

substation.

According to the company, the power

generated from the project will be

supplied to a group of consumers under

a third-party power sale model through

intra-state open access in Tamil Nadu.

The commissioning marks another ad-

dition to SWELECT Energy Systems’

renewable energy portfolio in the state.

SWELECT ENERGY SYSTEMS COMMENCES OPERATIONS

OF 4.40 MW SOLAR FACILITY

NEWS

Faridabad-based Omega Seiki Mobili-

ty (OSM), a manufacturer of electric

three-wheelers, is exploring a public

listing while seeking to raise around

₹125 crore through a pre-IPO funding

round, according to people familiar with

the development.

The company, known for its Rage+

cargo electric three-wheeler and Stream

City passenger electric three-wheeler, is

targeting an initial public offering (IPO)

by the end of the next financial year.

The ongoing funding round is expected

to be completed by the end of the

current quarter.

Investment bankers are valuing OSM at

around $175-225 million, factoring in

the company's projected revenue growth

and valuation benchmarks for electric

mobility firms.

The company has invested nearly ₹250

crore in manufacturing facilities across

the Delhi-NCR region and Pune as it

builds capacity to support its electric

vehicle expansion plans.

The

potential

IPO

and

pre-IPO

fundraise come as OSM seeks to

strengthen its position in India's grow-

ing electric mobility market and accel-

erate its expansion across cargo and

passenger electric vehicle segments.

OMEGA SEIKI MOBILITY EYES INVESTOR BACKING FOR

NEXT PHASE OF EV EXPANSION

16 | July 2026 | www.industrialoutlook.in

C&I PV-BESS-EV Charging Integrated Solution

Deye Winter MC-LC Series

Smart Cloud Management

Customizable load algorithms, 24/7 online O&M,

and real-time safety alerts

for optimized system performance

Ultimate Safety

3+3 Fire Protection System&Electrical Safety Safeguards

AC leakage & DC insulation detection,

high-voltage interlocking

Versatile Applications

Supports EV charging, peak shifting, virtual

power plants, and off-grid operations

Flexible Expansion

Support 2/4/6/8-hour

energy storage applications

Modular & Scalable Design

All-in-one PCS, BMS, EMS design,

expandable up to 10 parallel cabinets

High Energy Density

Maximized storage in a compact design for

space efficiency

MS-DCC180-2

DC Charging Terminal

MS-MPPT400-2

PV+On/Off-Grid

Switching Cabinet

MS-DC480-2

480kW DC Charge

Power Cabinet

MC-LC430

200kW/430kWh

AC BESS

MC-LC430-BC

430kWh

DC BESS

Powerica Limited has emerged as a

successful bidder in Gujarat Urja Vikas

Nigam Limited’s (GUVNL) e-reverse

auction for the procurement of power

from 250 MW grid-connected wind

power projects.

The company has secured a 50 MW

wind power project in the competitive

bidding process, with the electronic re-

verse auction concluding on July 9,

2026. Powerica’s discovered tariff was

₹3.51 per unit, reflecting a 2.77% varia-

tion from the tender’s start price.

The Letter of Award (LoA) is expected

to be issued to the company within the

timelines specified in the tender docu-

ment.

Following the award, Powerica will

enter into a direct Power Purchase

Agreement (PPA) with GUVNL for the

50 MW project. The power generated

from the project will help GUVNL meet

its Renewable Purchase Obligations

(RPO).

The company said it will leverage its

in-house engineering capabilities to

execute the wind project and ensure

completion within the timelines pre-

scribed under the tender framework.

POWERICA SECURES 50 MW WIND POWER PROJECT

FROM GUVNL AUCTION

NEWS

The Central Transmission Utility of

India (CTUIL) has revoked connectivity

for 24 renewable energy (RE) develop-

ers, affecting a total capacity of 6.43

GW over the past three years, Parlia-

ment was informed recently. The

cancellations were attributed to delays

on the part of power developers, not

transmission-related issues.

“Since 2022, Central Transmission

Utility of India Ltd (CTUIL) has re-

voked connectivity of 24 grantees with

a renewable energy capacity of 6,343

MW. The cancellations are on account

of developer delays and not due to

transmission side delays,” Minister of

State for Power Shripad Naik stated in a

written reply to the Rajya Sabha.

He also noted that sixteen petitions are

currently pending before the Central

Electricity

Regulatory

Commission

(CERC), filed by power generators

seeking protection from the revocation

of connectivity.

TRANSMISSION CONNECTIVITY OF 6.43 GW

RENEWABLE PROJECTS REVOKED SINCE 2022

18 | July 2026 | www.industrialoutlook.in

Rahuri Cleantech Private Limited, a

subsidiary of Bhageria Industries Limit-

ed, has successfully commissioned a 7

MW solar photovoltaic (PV) power

plant at Khanapur in Shevgaon taluka of

Ahilyanagar

district,

Maharashtra,

2026.

The project is part of an aggregate 32

MW capacity under the Mukhyamantri

Saur Krushi Vahini Yojana (MSKVY)

2.0, a state initiative aimed at strength-

ening solar-powered agricultural infra-

structure and improving energy access

for rural consumers.

RAHURI CLEANTECH PVT LTD BOOSTS RENEWABLE

PORTFOLIO WITH 7 MW SOLAR PROJECT

NEWS

TAs India continues to add renewable

energy capacity at a record pace, solar

energy companies are increasingly in-

vesting in Battery Energy Storage Sys-

tems (BESS) manufacturing to address

the growing need for reliable power

storage and grid stability.

Leading solar module manufacturer Wa-

aree Energies has set a target of achiev-

ing 20 gigawatt-hours (GWh) of BESS

capacity by FY28. The planned capacity

will cover the manufacturing of battery

cells, battery packs and utility-scale

BESS containers.

Through its subsidiary, Waaree Energy

Storage Solutions, the company has pro-

posed a capital expenditure of ₹10,000

crore for its battery storage business,

including the establishment of an

₹8,000-crore battery gigafactory in

Andhra Pradesh. Waaree expects to

operationalise 3.5 GWh of BESS pro-

duction capacity by FY27.

Meanwhile, Kolkata-based Vikram So-

lar has outlined plans to build 15 GWh

of BESS capacity by 2030. The compa-

ny will initially focus on assembling

battery packs and containerised energy

storage systems using externally sourc-

ed cells before gradually expanding into

integrated battery cell manufacturing.

SOLAR COMPANIES EXPAND STORAGE CAPABILITIES

WITH BATTERY ENERGY SYSTEMS

20 | July 2026 | www.industrialoutlook.in

+<+4:':

9;6658:+*(?

SOLAR SYSTEMS

HEROES

NOT ALL , WEAR CAPES

SOME INSTALL,

www.solaripl.com

Register Your Team

CASH PRIZES

WORTH RS. 5 LAKHS

GET RECOGNIZED

BY POLICY MAKER'S

MAXIMUM BRAND

VISIBILITY AND EXPOSURE

GRE

Renew

Enertech

Limited

(formerly GRE Renew Enertech Private

Limited) has announced that its wholly

owned subsidiary, GRE Green Energy

Private Limited, has successfully com-

missioned and operationalised a 1.5

MW (AC) / 2.016 MW (DC) solar pow-

er project in Gujarat.

The project is located at Village Indrap

in Becharaji taluka of Mehsana district.

Following requisite approvals and com-

pletion of meter sealing formalities, the

plant commenced power generation, the

company said.

The commissioning certificate from the

Gujarat Energy Development Agency

(GEDA) is currently under process and

is expected to be received in due course.

The company said the project adds to its

growing renewable energy asset base

and strengthens its presence in the solar

power segment.

GRE GREEN ENERGY COMMENCES OPERATIONS

AT SOLAR POWER PROJECT

NEWS

Rosatom State Corporation recently

announced the installation of the Reac-

tor Pressure Vessel (RPV) in Unit 5 of

the Kudankulam Nuclear Power Plant.

The Russian state-owned company,

which is the main developer of the Ku-

dankulam nuclear project, said the RPV

installation marks a key milestone in the

construction of the unit.

Reactor Pressure Vessels are large,

high-precision containment structures

that house the reactor core where nucle-

ar fission takes place. They are engi-

neered to withstand extreme tempera-

tures

and

high-pressure

operating

conditions.

According to Rosatom, the RPV for

Unit 5 was installed using the “open

top” method, where heavy equipment is

lowered into the reactor building using

a heavy-duty crane before the contain-

ment dome is erected.

KUDANKULAM NUCLEAR POWER PLANT UNIT 5 SEES

INSTALLATION OF REACTOR PRESSURE VESSEL

22 | July 2026 | www.industrialoutlook.in

GRE The Central Electricity Regula-

tory Commission (CERC) has approved

a one-time General Network Access

(GNA) relaxation for renewable energy

projects with letters of award (LoAs)

issued between January 2019 and May

2025. The measure is aimed at enabling

the utilisation of nearly 22 GW of

blocked interstate transmission system

(ISTS) renewable capacity for which

power purchase agreements (PPAs)

have not been signed, of which around

6.35 GW is affected by transmission

planning issues. Additionally, renew-

able energy implementing agencies

(REIAs) have informed that PPAs for

2,490 MW may be signed, with discus-

sions currently underway.

Furthermore, the relaxation provides

eligible developers with four one-time

options: exit state-backed LoA with

loosing grid connectivity and move

forward as merchant or independently

contracted projects, replace the stalled

LoA with an active PPA linked to anoth-

er project LoA, surrender the GNA if

the project is no longer being pursued,

or continue under the existing GNA

regulations, subject to applicable regu-

latory requirements, including penalties

and cancellation if project deadlines are

not met.

CERC INTRODUCES ONE-TIME GNA RELAXATION

FOR RENEWABLE ENERGY PROJECTS

NEWS

AMPIN Energy Transition has signed

a power purchase agreement (PPA)

under Solar Energy Corporation of

India Limited (SECI) Tranche VII for

its 199 MW/800 MWh firm and

dispatchable renewable energy (FDRE)

project. The project integrates renew-

able energy with battery energy storage

system. The project was awarded under

SECI’s 1,200 MW/4,800 MWh FDRE

tender, in which AMPIN Energy Utility

Nine, a subsidiary of AMPIN Energy

Transition, secured a capacity at a tariff

of Rs 6.28 per kWh.

Furthermore, the scope of work in-

cludes ensuring a daily supply of 4,000

kWh/MW of contracted capacity during

four peak hours selected by the buying

entity. It also includes identifying the

land, setting up the project, obtaining

statutory approvals, and securing con-

nectivity arrangements with the inter-

state transmission system or state trans-

mission utility.

AMPIN Energy Transition commis-

sioned approximately 500 MWp of

inter-state

transmission

system-con-

nected wind solar hybrid capacity at

Fatehgarh-IV substation in Barmer,

Rajasthan.

Also, AMPIN Energy Transition com-

missioned a 45 MWp solar project in

Odisha. AMPIN handled the entire

project execution, from land selection

to construction and final commission-

ing.

AMPIN ENERGY INKS PPA FOR 199 MW

FDRE PROJECT WITH SECI

24 | July 2026 | www.industrialoutlook.in

WWW.SAEL.CO

SAEL INDUSTRIES LIMITED IS A VERTICALLY INTEGRATED

AND DIVERSIFIED RENEWABLE ENERGY COMPANY

3625 MW TopCon Module

Manufacturing Line

+ 5000 MW (in-pipeline)

5000 MW Solar Cell

Manufacturing (in-pipeline)

8299 MWp Solar IPP

(Contracted + Awarded)

164.9 MW Agri

Waste-to-Energy

DISCLAIMER: This announcement does not constitute an invitation or offer of securities for sale in any jurisdiction. This announcement has been prepared for publication in India only and is not

for publication or distribution, directly or indirectly, in or into the United States. The Equity Shares have not been and will not be registered under the United States Securities Act of 1933, as

amended (the “U.S. Securities Act”) or any state securities laws in the United States, and unless so registered, may not be offered or sold within the United States, except pursuant to an exemption

from, or in a transaction not subject to, the registration requirements of the U.S. Securities Act and any applicable U.S. state securities laws. Accordingly, the Equity Shares are being offered and

ĮďăÌȧðȨðĊĴìЀĊðĴÐÌwĴ­ĴÐĮďĊăřĴďȵĪķ­ăðťÐÌðĊĮĴðĴķĴðďĊ­ăÅķřÐīĮȶȧ­ĮÌÐťĊÐÌðĊtķăÐǠǣǣķĊÌÐīĴìЀȘwȘwÐÆķīðĴðÐĮÆĴȨðĊĴī­ĊĮ­ÆĴðďĊĮÐŘÐĉĨĴåīďĉșďīĊďĴĮķÅþÐÆĴĴďșĴìÐīÐæðĮĴī­ĴðďĊīÐĪķðīÐĉÐĊĴĮ

ďåĴìЀȘwȘwÐÆķīðĴðÐĮÆĴ­ĊÌȧððȨďķĴĮðÌÐĴìЀĊðĴÐÌwĴ­ĴÐĮðĊȵďååĮìďīÐĴī­ĊĮ­ÆĴðďĊĮȶ­ĮÌÐťĊÐÌðĊș­ĊÌðĊīÐăð­ĊÆÐďĊtÐæķă­ĴðďĊwķĊÌÐīĴìЀȘwȘwÐÆķīðĴðÐĮÆĴ­ĊÌðĊ­ÆÆďīÌ­ĊÆÐœðĴìĴìÐ

applicable laws of the jurisdictions where such offers and sales occur. There will be no public offering of the Equity Shares in the United States.

Disclaimer: “SAEL Industries Limited (the “Company”) is proposing, subject to receipt of requisite approvals, market conditions, and other considerations, to make an initial public offer of its equity

Įì­īÐĮ­ĊÌì­ĮťăÐÌ­Ìī­åĴīÐÌìÐīīðĊæĨīďĮĨÐÆĴķĮȧȵ#t>qȶȨÌ­ĴÐÌǢīÌUďŒÐĉÅÐīǡǟǡǤœðĴìĴìÐwÐÆķīðĴðÐĮ­ĊÌ'ŘÆì­ĊæÐď­īÌďåAĊÌð­ȧȽw'AȶȨȘ}ìÐ#t>qðĮ­Œ­ðă­ÅăÐďĊĴìМÐÅĮðĴÐĮďåďķī

ďĉĨ­Ċřș­ĴìĴĴĨĮȚȥȥœœœȘĮ­ÐăȘÆďȥðĊŒÐĮĴďīĮȥďååÐīȭÌďÆķĉÐĊĴĮȥÌīìĨȥșw'A­ĴœœœȘĮÐÅðȘæďŒȘðĊ­ĮœÐăă­ĮďĊĴìМÐÅĮðĴÐĮďåĴìÐÅďďāīķĊĊðĊæăЭÌĉ­Ċ­æÐīĮșAAAwÐÆķīðĴðÐĮOðĉðĴÐÌșNďĴ­ā

T­ìðĊÌī­­ĨðĴ­ăďĉĨ­ĊřOðĉðĴÐÌșLT9ðĊ­ĊÆð­ăOðĉðĴÐÌ­ĊÌĉÅðĴqīðŒ­ĴÐOðĉðĴÐÌș­ĴœœœȘðÆðÆðĮÐÆķīðĴðÐĮȘÆďĉșœœœȘðĊŒÐĮĴĉÐĊĴÅ­ĊāȘāďĴ­āȘÆďĉșþĉŦȘÆďĉ­ĊÌœœœȘ­ĉÅðĴȘÆďīÐĮĨÐÆĴðŒÐăřș­ĊÌ

the websites of the stock exchange(s) at www.nseindia.com and www.bseindia.com, respectively. Any potential investor should note that investment in equity shares involves a high degree of risk,

­ĊÌåďīÌÐĴ­ðăĮīÐă­ĴðĊæĴďĮķÆìīðĮāșĮÐÐȵtðĮā9­ÆĴďīĮȶďåĴìÐ#t>qȘqďĴÐĊĴð­ăðĊŒÐĮĴďīĮĮìďķăÌĊďĴīÐăřďĊĴìÐ#t>qťăÐÌœðĴìw'Aåďī­ĊřðĊŒÐĮĴĉÐĊĴÌÐÆðĮðďĊȘ

tÐÌķÆðĊæ'ĉðĮĮðďĊĮÅř

Converting Agri Waste

Into 24x7 Power

Scaling Utility Scale

Solar Projects And

Solar Manufacturing

Our Footprint

WE ARE

CONTRIBUTING

TOWARDS INDIA’S

CLEAN ENERGY

TRANSITION

AND 500 GW

RENEWABLE ENERGY

MISSION BY 2030

ăăÆ­Ĩ­ÆðĴðÐĮ­ĮďĊǢǟĴìwÐĨĴȘǡǟǡǤ

26 | July 2026 | www.industrialoutlook.in

Q. Elaborate how Balaji Switch-

gears became a leading technology

partner for automation products?

Our journey in automation has been

driven by understanding customer

applications rather than simply supply-

ing products. Over the years, we real-

ised that OEMs, panel builders, and

industries needed a partner who could

help them solve engineering challeng-

es, improve productivity, and build re-

liable electrical systems. This led us to

strengthen our capabilities in industri-

al automation, intelligent motor con-

trol, PLCs, HMIs, VFDs, sensors, safe-

ty solutions, and energy management.

Today, our role extends beyond

distribution. We support customers

through application engineering, prod-

uct selection, retrofitting, commission-

ing support, and structured AMC ser-

vices. By combining globally recogni-

sed automation technologies with prac-

tical engineering expertise, we help

customers modernise their operations

while ensuring reliability, efficiency,

and long-term performance. I believe

this solution-oriented approach is what

has established Balaji Switchgears as a

trusted technology partner.

Q. What will be the vision and

roadmap of Balaji Switchgears in

automation in the year 2026?

Our vision for 2026 is to accelerate the

adoption of intelligent automation

across Indian industry. As manufactur-

ing moves towards Industry 4.0, digi-

talisation, and energy-efficient opera-

tions, we want to help customers make

this transition in a practical and com-

mercially viable way.

Our roadmap is focused on expanding

automation solutions that integrate in-

telligent switchgear, PLCs, VFDs,

SCADA, IIoT-enabled monitoring,ma-

chine safety, and energy management

into a connected ecosystem. Alongside

new installations, we see significant

opportunities in retrofitting existing

infrastructure with smart technologies

that improve visibility, reliability, and

operational efficiency without major

capital investment.

Equally important will be strengthen-

ing our engineering capabilities, tech-

nical support, and lifecycle services

so that customers receive complete

automation solutions not just individu-

al products.

Q. Briefly describe your view-

point on the role of digital intelli-

gence, the importance of sustainable

growth, and the value of AI-led

transformation in the automation

sector?

From our perspective, digital intelli-

gence is changing automation from

reactive to predictive. Real-time data,

combined with AI, enables industries

to anticipate failures, optimise energy

consumption, improve asset perfor-

mance, and make faster, informed

decisions. The true value of AI lies not

in replacing people, but in helping

them operate more efficiently and

safely.

Sustainable growth is equally import-

ant. Automation today must deliver

higher productivity while reducing

energy

consumption,

waste,

and

carbon emissions. Balaji Switchgears,

helps OEMs and industries adopt prac-

tical automation, intelligent monitor-

ing, and energy-efficient solutions

that improve reliability, support long-

term sustainability, and prepare busi-

nesses for the next generation of smart

manufacturing.

Mr. Piyush Garg

Director

Balaji Switchgears Pvt. Ltd.

Our vision for

2026 is to

accelerate

the adoption

of intelligent

automation

across Indian

industry

INTERACTION

You can read

this story

online by

scanning

the QR code

28 | July 2026 | www.industrialoutlook.in

Q. SDTRONICS

has

evolved

from a small enterprise into one of

India's trusted automation cable

manufacturers. Could you share the

key milestones that have defined this

journey?

When we started SDTRONICS, the

objective was never to become the

biggest manufacturer. We wanted to

solve a problem. At that time, custom-

ers were dependent on imported

automation cables, which meant long

lead times, high costs, and limited

flexibility. We saw an opportunity to

manufacture these products in India

with the same level of quality while

offering much faster deliveries and

technical support.

One milestone naturally led to another.

We kept expanding our product range

based on customer requirements. From

programming cables, we moved into

servo power and encoder cables, In-

dustrial Ethernet cables, I/O cables,

and customised cable assemblies. We

also invested continuously in our man-

ufacturing capabilities, quality sys-

tems, and testing facilities instead of

chasing rapid expansion.

Another important milestone has been

earning the trust of leading machine

builders and automation companies.

Many of our customers have been

associated with us for years, and that

gives us confidence that we are

moving in the right direction. Today,

SDTRONICS is known not just for

manufacturing cables, but for provid-

ing dependable connectivity solutions

backed by engineering support.

Q. Industrial automation is adv-

ancing rapidly with Industry 4.0,

IIoT, and smart manufacturing.

How is SDTRONICS adapting its

product portfolio to meet these

changing demands?

Industrial automation is evolving very

quickly, but one thing remains con-

stant. Every smart machine depends on

reliable connectivity. That's exactly

where we see our role.

Our focus is on developing products

that support modern automation sys-

tems. We are strengthening our range

of Industrial Ethernet cables for high-

speed industrial communication, ex-

panding our drag chain duty cable port-

folio for demanding motion applica-

tions, and introducing more applica-

tion-specific cable solutions that sim-

plify installation and improve machine

reliability.

We also work very closely with OEMs

and machine builders. Many of our

products are developed after under-

standing a specific application rather

than simply adding another product to

the catalogue. This approach allows us

to deliver practical solutions that help

customers improve performance and

reduce downtime.

Q. Which industry sectors do

you see as the biggest growth oppor-

tunities for SDTRONICS in the

coming years?

India's manufacturing sector is enter-

ing a very exciting phase. Automation

is no longer limited to large factories.

Companies of every size are investing

in smarter machines, better productivi-

ty, and higher efficiency.

For us, factory automation will contin-

ue to be the biggest growth driver.

Along with that, we see tremendous

opportunities in warehousing automa-

tion, robotics, machine tools, packag-

ing machinery, food processing, phar-

maceuticals, electric vehicles, and

renewable energy. All of these indus-

tries require reliable cable solutions

that can perform consistently in dema-

nding operating conditions.

At SDTRONICS, our priority is not to

enter every possible market. We want

to deepen our expertise in automation

and become the first choice whenever a

customer is looking for high-quality

industrial connectivity solutions. We

believe that staying focused and con-

tinuously improving our products will

create long-term value for both our

customers and our company.

Mr. Manojit Brahme

Director

SDTRONICS PVT. LTD.

Driving

Industrial

Automation

Through

Innovation

INTERACTION

You can read

this story

online by

scanning

the QR code

An ISO 9001:2015 Company

THINK SAFETY

THINK

NO. 1

FOR HIGH SAFETY

TEST & MEASURING INSTRUMENTS

Shop No.18, 1st Floor, CIDCO Shopping Complex, Plot # 9, Sector-7, Rajiv Gandhi Marg,

Sanpada, Navi Mumbai - 400705. Tel : +91-9867488006 / 9867675093

E-mail : sales@kusam-meco.co.in Website : www.kusamelectrical.com

TEST & MEASURING INSTRUMENTS

5,00,000 COUNTS

TRMS DIGITAL MULTIMETER

WITH PC INTERFACE

MODEL - KM 857 / KM 859CF

60,000 COUNTS

AC & AC+DC TRMS

DIGITAL MULTIMETER WITH

NON-CONTACT EF-DETECTION

MODEL - KM 789

AC; AC+DC TRMS

DIGITAL MULTIMETER

WITH PC INTERFACE

MODEL - KM 829

1000A AC / DC;

DC + AC TRMS

CLAMPMETER

MODEL - KM 088

AC/DC TRMS CLAMPMETER

WITH VFD, EF-DETECTION,

PC INTERFACE FOR

SOLAR APPLICATION

MODEL - KM 3001

3¾ DIGIT 4000 COUNTS

DIGITAL MULTIMETER

MODEL - 801-L

6000 COUNTS TRMS

DIGITAL MULTIMETER

MODEL - KM 60-T

3½ DIGIT 1999 COUNTS

DMM WITH TERMINAL

BLOCKING SYSTEM

MODEL - KM 6030

600A AC

DIGITAL CLAMPMETER

MODEL - 2700

1000A AC TRMS CLAMPMETER

WITH 3 PHASE ROTATION &

SEQUENCE INDICATION

MODEL - KM 086

1000A AC

DIGITAL CLAMPMETER

WITH INRUSH CURRENT

MODEL - KM 999A+

1000A AC

DIGITAL CLAMPMETER

MODEL - KM 3060

DIGITAL EARTH RESISTANCE

& SOIL RESISTIVITY TESTER

MODEL - KM 4234ER /

KM 4235ER

1KV ~ 20G

INSULATION RESISTANCE

TESTER

(11 SETS OF ADJUSTABLE

OUTPUT VOLTAGE)

MODEL - KM 371

2.5KV ~ 50G

1500V AC/DC INSULATION

RESISTANCE TESTER + SOLAR

APPLICATIONS

MODEL - KM 375

®

KM 1521

5 / 10 / 15KV INSULATION

RESISTANCE TESTER

MODEL-KM 5405/5410/5415

5 / 10 / 15KV HIGH VOLTAGE

INSULATION

RESISTANCE TESTER

MODEL-KM 5305/5310/5315

1KV ~ 20G

INSULATION RESISTANCE

TESTER + DMM

MODEL - KM 372

5KV ~ 1T

INSULATION RESISTANCE

TESTER WITH

PI MEASUREMENT

MODEL - KM 2805MK-1

DUAL CLAMP

DIGITAL EARTH RESISTANCE

TESTER (2/3/4 WIRE)

MODEL - KM 4237ER

4 TERMINAL DIGITAL

EARTH RESISTANCE &

SOIL RESISTIVITY TESTER

MODEL - KM 2040

DIGITAL EARTH GROUND

RESISTANCE TESTER

MODEL - KM 1521

3 TERMINAL DIGITAL

EARTH RESISTANCE TESTER

MODEL - KM 2030A

CLAMP-ON TYPE

EARTH RESISTANCE &

CURRENT LEAKAGE TESTER

MODEL - KM 1620 / KM 1720

7½ DIGIT BENCH TOP TRMS DIGITAL MULTIMETER

MODEL- KM 3700

An ISO 9001:2015 Company

SINCE 43 YEARS

NEW